Menu

Projects

On-going Projects

Sl.No. Employer/Client Main Contractor Project Description Project Value AED (MLN)
1 ADM/ADDC WBG Contract No: 19/2016:Miscellaneous Works For Khalifa City And Shakhbout Cities(Supply & Installation of DN 100, DN 150, DN 200, DN 250, DN 300, DN 400 Ductile Iron Pipeline and fittings –as per work order or site instructions , Installation of Gate Valves, Butterfly valves, Air Release Valves inside the Chambers, Fire Hydrants etc as per work order or site instructions , Flushing and Disinfection , Shutdown and Connection with Existing line) 2,000,000.00
2 MUSANADA/AADC AL JABER Construction of Emirate Housing Neighbourhood – Al Saad Area (306 Villas) Al Ain(Supply & Installation of HDPE OD 110 to 355 mm ,Supply & Installation Gate Valve, Air Release Valve ,Control valve , DMA system, House Connection works ) 9,580,000.00
3 MUSANADA/AADC AL JABER Construction of Emirati Housing Neighborhood Sweihan Area (204 Villas). (Supply & Installation of DI Pipes & HDPE OD 110 to 355 mm ,Supply & Installation Gate Valve, Air Release Valve , House Conenction works ) 6,950,000.00
4 MUSANADA/ADM/ADDC AGILITY Construction of Improvements to Traffic Entry & Exit at AI Maqtaa Area-(Supply and installation of HOPE Pipe 250mm dia ,Including all fittings, shutdown, connection to Existingline, testing & commissioning Excavation,backfilling, Dewatering , Complete works .. , (ADDC)/ADM)- (Inspection Chambers; Supply and installation of Inspection Chamber Including all fittings, connection to line, testing & commissioning, Excavation, backfilling, Dewatering, Complete works .. , (ADM) 2,500,000.00
5 MUSANADA/ADM/ADDC AGILITY Development and Improvement Of Marina Bateen Street-( Supply & Installation of DN 150 MM Ductile Iron Pipeline and fittings -540 Meters., , Installation of Air Release Valves ,SMP chamber, PTFH – including , Flushing and Disinfection, Shutdown and Connection with Existing line) 5,500,000.00
6 MUSANADA/ADDC AGILITY Construction of Zayed Road Network In Mina Zayed Area Stage 01 – Main Tunnel -(( Supply & Installation of DN100 MR= 348,DN150 MR= 50, DN200 MR=550, DN300 MR= 580,DN400 MR=600, Installation of Air Release Valves ,SMP chamber, PTFH – including , Flushing and Disinfection, Shutdown and Connection with Existing line) and Exhumation of Exisitng DI Pipe line 12,100,000.00
7 ADDC ADDC Replacement of Water Meters for Ezbas and Related Water Connection Works( 1461 Water meters) – The scope includes site preparation, meter installations or replacement, water connection works, cancellation of redundant water connections, construct new or repair / modify existing house connection chambers & accessories, collect and transport the meters from ADDC Water meter workshop / Stores to different locations, commission the meter, associated fittings and house connection works, collect and transport the removed meters / exhumed items from different locations to ADDC Water meter workshop or ADDC designated stores and report the replacement of the meter with the aid of HHU’s to ADDC billing system. 1,465,000.00
8 ETIHAD RAIL COMPANY PJSC CSSK JV Protection and Relocation of Water Pipes: The scope of Subcontract Works covers relocation of Water Division Pipelines of varying dias – Design to the extent required, Topographic/Geotechnical Survey, Supervision, Preparation of Shop Drawings & As Built Drawings, Obtaining requisite approvals/permits from the authorities, Temporary Works and Facilities, Supply of Materials, Dewatering, Earth Works, Civil Works, Removal of existing pipes, Transportation and stocking of removed pipes to ADDC Store or to approved tip, Laying of new pipes with fittings, providing concrete surrounds, thrust blocks, Corrosion Protection for pipes, cleaning, wrapping tape,jointing, disconnection and connection to existing pipes, testing, flushing, disinfection markers and so on. All the Subcontract Works are required to be carried out to the Specifications of the concernedService Authorities. 13,100,000.00
9 M/s. AI FARWANIYA PROPERTY DEVELOPMENT ltinera SPA and Ghantoot Transport & General Contracting LLC REEM MALL, AI Reem Island, Abu Dhabi – Sector: RRl – Plot No.: CS, Package: RM-3000 – Main Construction Works & Infrastructre -proper protection of Pipelines for existing Potable Network and existing Storm Water Networks. 491,472.00
Total Value in AED 48,234,227.00

 

Completed Projects

Sl.No. Employer/Client /Main Contractor Project Description Project Value AED  (MLN)
1 Abu Dhabi Health Services (SEHA)/ADDC Project: Al Mafraq New Hospital Project(Supply and Installation of 100 mm DI pipeline 50 Meter, Supply and Installation of 200 mm DI pipeline 12 Meter, Supply and Installation of 600 mm DI pipeline 12 Meter, Supply and Installation of Electro magnet flow meter with Concrete chamber 100 MM, Supply and Installation of Electro magnet flow meter with Concrete chamber 200 MM,Shutdown with existing 200mm DI pipeline,Shutdown with existing 600mm DI pipeline ) 550,000.00
2 Abu Dhabi Municipality-Irrigation Department /ADDC Project :Connection of 400 MM HDPE Pipeline( Installation of 400 mm HDPEI pipeline 48 Meter, Installation of 600 mm GRP pipeline 12 Meter, Installation of 400 mm Electro magnet flow meter with Concrete chamber, Shutdown and Connection with existing 600mm GRP Pipeline) 575,000.00
3 National Investment Company (NIC)/ADDC Project : Abu Dhabi Marina City Development( Supply and Installation of OD 160 mm HDPE pipeline 3000 Meter, Supply and Installation of 200 mm DI pipeline 24 Meter, Supply and Installation of 400 mm DI pipeline 12 Meter, Supply and Installation of 150mm Gate valve 19 Numbers with Concrete chamber, Supply and Installation of Air release Valve with Concrete chamber, Supply and Installation of Electro magnet flow meter with Concrete chamber 100 MM, Supply and Installation of 100mm Fire hydrant 23 Numbers, 25 mm House connections for villas 68 numbers, Shutdown with existing 400mm DI pipeline, Shutdown with existing 200mm DI pipeline ) 2,000,000.00
4 National Investment Company (NIC) / ADDC Project :Abu Dhabi Marina Mall Extension, Phase II, Division of Services & Access Mitigation Works.( Supply and Installation D.I Pipes DN 300 156 Meter, Supply and Installation D.I Pipes DN 400 12 Meter, Supply and Installation D.I Pipes DN 100 12 Meter, Supply and Installation of 100mm Gate valve 4 Numbers and 300 mm Gate valve 1 number with Concrete chamber, Supply and Installation HDPE Pipes OD 150 456 Meter) 900,000.00
5 MANAZEL/ADDC/FIBREX Manazel al reef 2 development in Sahma, Abu Dhabio Supply & Installation of DN 250mm Ductile Iron Pipeline and fittings -495 Meters.( Supply & Installation of DN 400mm Ductile Iron Pipeline and fittings- 786 Meters, Supply & Installation of Butterfly valve inside the Chambers DN 400-1 No.,Supply & Installation Gate valves inside the Chambers DN 250-5 Nos, Supply & Installation Control valves inside the Chambers DN 200-2 Nos,Supply & Installation Flow meter inside the Chambers DN 200-2 Nos,Supply & Installation Non Return Valve inside the Chambers DN 200-2 Nos, Flushing and Disinfection Shutdown and Connection with Existing line) 2,600,000.00
6 MUSANADA / ADDC / L&T – DELMAJV Improvement of Mafraq to Al Ghweifat Border Highway, Section 4 A, Himeem Interchange to Abu Al Abyad-Subcontract for Potable Water works-Relocation works( Installation of DN 600mm Ductile Iron Pipeline and fittings -2650 Meters.,Installation of DN 800mm Ductile Iron Pipeline and fittings- 198 Meters(Supply &
Installation Gate valves inside the Chambers, Flushing and Disinfection Shutdown and Connection with Existing line)
3,900,000.00
7 MUSANADA /ADDC/ AL JABER Improvement of AI Mafraq to Ghwafat Border Post-Highway section 3A(Supply & Installation of DN 500mm Ductile Iron Pipeline and fittings -170 Meters.,Supply & Installation Air Release Valve inside the Chambers DN 100-1 Nos) 675,000.00
8 MUSANADA /ADDC/ AGILITY Abu Dhabi TRIP Contract No. 1401- Completion of Development Works of Sheikh Zayed Bin Sultan Street from AI Falah Intersection to Sea Palace Intersection – Package 1 (Relocation of DN 150 Air Release Valve Chamber for ADDC & TRANSCO Line(Supply & Installation Air Release Valve ,Butter fly valve inside
the Chambers , Flushing and Disinfection Shutdown and Connection with Existing line)
2,635,277.00
9 MUSANADA /ADDC/ AGILITY Development of AI Zahiyah Area (Previous Tourist Club Area) -(Supply & Installation of DN 80mm -DN 150 – 168mm., Supply & Installation of DN 200mm – DN 300 -168mm,Supply & Installation Gate Valve, Air Release Valve ,Butter fly valve inside the Chambers ) 8,998,900.00
10 MUSANADA/ADDC/ AL JABER Improvement of Al Mafraq to Ghwaifat Border Post-Highway Section 3B: From Abu Al Abyad to Al Mirfa.-Relocation works( Supply & Installation of DN 100mm Ductile Iron Pipeline and fittings -200 Meters., Supply & Installation of DN 200mm Ductile Iron Pipeline and fittings -2334 Meters, Supply & Installation of DN 300mm Ductile Iron Pipeline and fittings -750 Meters, Supply & Installation of DN 400mm Ductile Iron Pipeline and fittings -520 Meters, Installation of Air Release Valves inside the Chambers- 2 Numbers, Flushing and Disinfection, Shutdown and Connection with Existing line) 3,713,000.00
Total Value in AED 26,547,177.00